The Launch Day War Room
Plan launch day end to end
We launch in two weeks: [THE PRODUCT/FEATURE, THE AUDIENCE, THE CHANNELS WE ARE USING, WHAT SUCCESS LOOKS LIKE IN NUMBERS]. Build the launch day plan: the hour-by-hour schedule for launch day (who posts what, who watches metrics, who owns support), the three things most likely to break and the pre-written response for each, the go/no-go checklist for the night before, and the rollback trigger - the number or event that means we pull it. Then the plan for days 2-7, because launch day is the easy part.
Inputs needed
- #What is launching, audience, channels, success metrics
What good output looks like
Hour-by-hour with named owners; break scenarios have pre-written responses; rollback trigger is a number, not a feeling; days 2-7 planned
The stream
Reading the room…
Same drawer
The Positioning Stress Test
Positioning
PT-0254The Weekly Client Status Report
Standardize client status reporting
PT-0279Tighten a Draft With a Skeptical Editor
Rewrite a draft to lead with its boldest claim, remove filler, and replace vague language with specifics.
PT-0278B2B Positioning, Objection Rebuttals & Cold Email Sequence
Turn a product description into positioning, objection rebuttals, and a five-email cold outreach sequence.